What’s Proposed
One AISD Ballot:
Two Propositions
The bond proposal will be presented to voters in two separate propositions. Voters have an opportunity to vote for or against both propositions. Voters should record their vote in each of the two propositions on the ballot.
Grade Realignment
This bond proposal is a part of a district master facility plan that has been developed over the span of several years. Projects from the 2019 bond began a process of grade realignment across the district, and this bond would complete that long-term grade realignment, with PreK-5th grade elementary schools, a 6th-8th grade junior high school, and a 9th-12th grade high school. This will mean fewer changes and transitions for students and greater operational efficiency and cost savings for the district.
Approximately 500 Additional Seats for PreK-5
AISD is expected to grow by 900 new students in 5 years. This anticipated enrollment will exceed the combined capacity of all elementary campuses by 2026-27.
By constructing a New Elementary North, expanding Lillian and converting AIS to Elementary South, the district will add approximately 500 additional seats for PreK-5 as well as address the aging condition of its oldest campuses.
Proposition A: $107,450,000
PROJECTS TO ADDRESS ELEMENTARY GROWTH
Elementary North: Build a New School to Replace AEN
CURRENT CONDITIONS
Room sizes are below what is required by current TEA facility standards
Kitchen is undersized for the campus population.
Site paving and drainage issues
Texas Accessibility Standards/Americans with Disabilities Act issues with floor levels
Multipurpose classroom serving as gymnasium
Traffic flow is not adequate for campus / concrete work needed
NEW CAMPUS OVERVIEW
Grades PK-5
750-student capacity, 1,000-student core areas
Estimated opening 2024
Lillian Elementary: Expand Campus
CURRENT SIZE & CONFIGURATION
Lillian is currently a PK-2 campus with capacity for 435 students.
EXPANSION OVERVIEW
Grades PK-5
750-student capacity, 750-student core areas
Estimated completion of addition and renovations: Fall 2024
Intermediate: Convert to Elementary South, Update Campus
CURRENT CONDITIONS
Room sizes are below what is required by current TEA facility standards
Outdated infrastructure (electrical, sewage, water)
Safety/security inequities:
No controlled vestibule
Scholars exit building to get to other wings
Site paving issues (unpaved parking for staff).
nEW cAMPUS oVERVIEW
Grades PK-5
1,000-student capacity, 1,000-student core areas
Estimated completion of renovations: Fall 2024
Safety & Security Upgrades
Address Aging Conditions at AIS:
Interior Renovations
Handicap Accessibility
HVAC Replacement
Roof Replacement
PROJECTS AT AHS
High School: Add New Competition Gym
Current Conditions
Capacity Issues
Only one court for games/competition
Creates scheduling challenges
Bleachers cover the practice portion of the gym
New Gym Overview
Increase gym space at AHS
Additional space for volleyball, basketball, dance, PE
Provides more flexibility with scheduling
Add spectator seating
Additional space for Alvarado fans and visitors
Allows AHS to host additional competitions
Proposition B: $17,550,000
New Baseball & Softball fields
current conditions
Drainage Issues
Fields are often under water, creating cancellations and scheduling challenges
new fields at current site
Repair drainage issues
New field base & surface (artificial turf)
Covered spectator seating